500+ Furniture Items Installed at a Constrained Urban Site
On time Urban Furniture Move-In & Installation

Challenge
The project called for the move-in and installation of more than 500 items of furniture at an urban facility. The tight city location and limited maneuvering room access a central challenge, constraining how equipment and trucks could reach the site.
Solution
A team of 16 resources and 3 trucks supported the furniture move-in and installation. When the original plan to send tractor-trailers form the manufacturer directly to the destination proved unfeasible, the trailer could not fit the tight urban location, the team pivoted quickly. The load was routed to the WMS warehouse, unloaded, and reloaded into box trucks sized for internal delivery to the site.
Key Components
- 500+ furniture items delivered and installed
- 16 personnel and 3 trucks deployed
- Delivery plan adapted using WMS warehouse for temporary staging
- Oversized tractor-trailers replaced with appropriately sized box trucks
- Project timeline maintained despite unexpected site-access constraints
Outcome
All 500-plus furniture items were delivered and installed with no impact to the project timeline or level of service, despite the last-minute change in delivery method. The team's ability to re-stage the load through its own warehouse turned a potential access failure into a seamless delivery.
Why Choose Tobin / Wakefield
This project highlights the value of owning the full logistics chain, including warehouse capacity, and the judgment to use it. Rather than let a truck-access problem delay the job, the team re-staged the entire load into box trucks and delivered on time, demonstrating the responsiveness and problem-solving that urban installations demand.