100,000 Sq. Ft. Manufacturing Relocation Delivered in 10 Days

Precision Electronics Manufacturer | Full-Facility Relocation with Rigging & Crane Work

100,000 Sq. Ft. Manufacturing Relocation Delivered in 10 Days

The Challenge

A precision electronics manufacturer needed to relocate its entire operation a combined 100,000 sq. ft. of manufacturing and office space within a tight 10-day window. The move included extremely high-value machinery and materials, much of which required specialized rigging and crane work to disconnect, lift, and reposition safely.

With production equipment and sensitive materials in play, any mishandling or schedule slip carried significant financial and operational risk. A standard office move approach would not accommodate the weight, value, and complexity of the equipment involved.

The Solution

The project drew on combined Tobin and Wakefield Moving & Storage (WMS) resources to field the scale required. More than 20 movers and drivers supported the effort, moving the facility across more than 40 tractor-trailer loads over the 10-day schedule.

Specialized rigging and crane crews handled the high-value machinery, coordinating lifts and equipment repositioning as a controlled, sequenced process. Midway through the project the customer expanded the scope to include additional installation and decommissioning work — which the team absorbed and completed within the original allotted timeline.

Key Components

  • 100,000 sq. ft. of manufacturing and office space relocated in 10 days
  • 40+ tractor-trailer loads coordinated
  • 20+ movers and drivers deployed
  • Specialized rigging and crane work for high-value machinery
  • Additional installation and decommissioning completed within the original timeline

The Outcome

The full 100,000 sq. ft. relocation was completed on schedule in 10 days, including the added installation and decommissioning scope, with no extension to the project timeline. Drawing on both Tobin and WMS resources allowed the team to staff and execute a project of unusual scale and complexity as a single coordinated effort.

Why Choose Tobin / Wakefield

This project reflects the combined capacity of Tobin and Wakefield to execute large-scale, high-value manufacturing relocations under demanding timelines. The ability to deploy 40-plus loads, specialized rigging and crane crews, and 20-plus personnel while absorbing added scope mid-project without missing the deadline demonstrates the depth of resources and flexibility that complex industrial moves require.

request a quote

Ready to Get Started?

Get in touch with our team today and get a quote in less than 24 hours